Loading...

Entries Tagged Hydro International

Tpo Jeremythompson 198

What Really Treats Wastewater? (It’s Not the Bugs or the Machines.)

As a supervisor Jeremy Thompson has met his share of technical challenges. Now he’s looking to master the human side of operating a clean-water plant.
Team Photo

New and Repurposed Buildings Highlight This Treatment Plant Renovation

From outside, this clean-water plant’s buildings mostly look the same. The interiors tell a different story: some $84 million in process expansion and improvements.
Biosolids Preatment Thumbnail

Improve Sludge Quality with SlurryCup and Grit Snail Sludge Degritting and Screening

SSC Top Right Side

SpiraSnail Compact – Grit Dewatering Designed to Fit

Assembly GK and DC2

Compact Grit Removal Products Customized to Fit Small WWTP’s Needs

HGC Front View Isometric

Tired of Paying to Landfill Organics with Your Grit? Hydro GritCleanse Can Help

HGC Animation

Hydro GritCleanse – How it Works

Breaking News

Hydro International is Now Part of Oldcastle Infrastructure

Tpomag Seangreig Newmarketnh 032624 1

An Underrated Key to Success in Nutrient Reduction: Communication

A major clean water plant upgrade has put the New Hampshire Town of Newmarket on the map for success in nitrogen removal
HC Empty in Tank Concrete Duct Med Res

HeadCell Grit Removal – The Best Choice for Those Who Value Performance

HC Concrete Duct Side View Empty Med Res TRANS BACK

Applying Lamella Principles to Grit System Design

Higher Capacity Hydro Grit Cleanse

Hydro GritCleanse – Now with Higher Unit Treatment Capacity

Dumpster Load Midway Through Storm with 3 in of rain over 2 days

HeadCell / Hydro GritCleanse Stops Tons (Literally) of Grit from Entering WWTP During Record-Breaking Rains

Settling Velocity and Surface Overflow Rate

Apply Engineering Principles to Evaluate Grit System Performance