Loading...
Cleanwater1 case study
Problem: Jericho Water District of New York’s Long Island pumps most of its water from wells and was struggling to control corrosion in the pipes. That made it difficult to sustain accurate pressure and water speed. Solution: The district installed an Encore 700 simplex pump from Cleanwater1 in a new pump house. With a 2-inch diaphragm and robust motor-driven pulley drive, the pump has fewer parts and needs less maintenance. After successful performance testing, operators added more of the pumps to the distribution system. Result: The low-maintenance pump saved time, reduced operating costs and provided reliable and efficient operation with minimal system
Please login or register to view TPO articles. It's free, fast and easy!
Newsbrief300 180122 132243
Next ›› News Briefs: ​6 Countries Represented in 2025 Brew 2.0 Cohort

Related