Loading...
This content is sponsored by TNE. Sponsored content is authorized by the client and does not necessarily reflect the views of COLE Publishing. View our privacy policy.
IMG 7945

- Save 30% or more than the existing conventional technology such as positive displacement blowers.

- Price difference between technologies will be recovered within two years, and savings of benefit will turn into profits rather than costs through the service life of the blower.

- Capital budgeting: Generating positive Net Present Value and quick payback period considering purchase price and potential savings of operation for all ranges of the blower capacity.


 Case Study: Replacement of multistage blowers with high-speed turbo blowers

  • Installed at Anthem, Arizona (Epcor)
  • Six x 100 hp high-speed turbo blower
  • Each delivers 2,000 scfm at 4-8 psig
Anthem case study
IMG 2256 WEB
Orenco systems ols control panels
Next ›› Upgrade Your Control Panels With These 3 Products for the Water/Wastewater Industry

Related