The Escanaba Wastewater Treatment Plant in Michigan underwent a design upgrade to accommodate increased flows into their treatment plant that included a new headworks screen. They faced several challenges:
- Reusing the existing headworks channels offered limited space for an additional screen
- Increasing flow through the screen and limiting the headloss but using the same channel
- The length of the existing inlet channel left little room for a new screen
- Reusing the existing screen as backup and add another screen with limited space in the existing headworks