In July 2018, the Wastewater Treatment Plant in Eagle Mountain, managing 2 mgd, faced the need for efficient mechanical dewatering equipment. The facility, which operates an anaerobic process with secondary sludge, required a solution that could process 19 gpm or 1,272 dry solid pounds per day, within an eight-hour shift.
Solution
After careful consideration, and anticipating future growth, the Eagle Mountain facility selected the Prime Solution Model RFP-2.0-36 Single Skid, designed with an option for future expansion to meet the plant’s evolving needs. They chose the Rotary Fan Press for its flexibility and proven performance. By 2022, the plant was ready to upgrade its capacity, taking advantage of the system’s modular design. The Prime Solution team swiftly installed two additional channels, increasing the machine’s capacity to 57 gpm, or 3,816 dry solid pounds per day, ensuring the plant could meet its growing demands.