18-Mile Creek Upper Wastewater Treatment Plant is the central location for six facilities managed by a seven-person staff. Though their facilities do not exceed 1 mgd, they are designed so the staff conducts operations in a very hands-on manner. They’ve recently installed the Rotashield Septage Acceptance Plant at the central location, and the plant director has high expectations for its results.
Download the case study to learn more about the solution achieved with the RoFAS septage drum and WAP wash press.
Download Case Study















