AERZEN Rental Temporary Oil-Free Blowers
AERZEN Rental provides temporary oil-free blower packages engineered for aggressive rental environments with onboard variable-frequency drives, remote monitoring and...
Entries Tagged Fournier Industries
Online Exclusives
Rotary Press Helps Florida City Create Cost Savings
Problem: The Fernandina Beach (Florida) wastewater facility was hauling 2.34 million gallons of wet biosolids annually. Landfill costs were rising and landfill...
Editorial
Case Studies: Headworks and Biosolids Management
Modern decanters deliver twice the flow using half the power at water reclamation facility
Problem: A water reclamation facility in the Southeast needed to replace...
White Papers
Dewatering Presses Prove to Be the Right Fit
ProblemThe Brunswick (Maine) Sewer District sought a continuous dewatering solution to replace two existing 2-meter belt filter presses.Solution
The district chose two six-channel...
Editorial
First the Farthest East. Now the Farthest West. This Operator's Career Spans the Continent.
Not many clean-water operators can watch orca and humpback whales while doing plant rounds.That privilege belongs to Mark Descoteaux and his five-member...
Editorial
Case Studies: Clarifiers, Digesters, Water Towers, Structures and Components
Press moves discharge permit approval, reduces costs
ProblemDave Hapchuk owns and operates a septage receiving facility where he pretreats septage from his operation...
Editorial
Case Studies: Headworks and Biosolids Management
Centrifuges help treatment plant save substantial annual costs
Problem
The Greenway Wastewater Treatment plant in London, Ontario, used belt presses to dewater biosolids. The solids...
Online Exclusives
How WWTP Tours Can Help Operators Get Acquainted With New Processes
The Macon Water Authority (MWA) in Georgia recently completed about $51 million worth of long overdue rehab work on its two wastewater...
Editorial
Revenue from Septage Keeps a Clean-Water Plant Financially Sound After a Major Discharger's Departure
The Richmond clean-water plant was humming along just fine until the Vermont town’s creamery shut down in 1999.
“With the creamery, our flows...
Editorial
Case Studies - February 2022
No more manual raking for pump station operators
Problem
The Louisiana Pump Station in Tampa, Florida, moves up to 35 mgd. It needs high-quality...
Editorial
Through a Decade of Effort, Murfreesboro Wins Dramatic Effluent Nitrogen and Phosphorus Reductions
When facing what seemed insurmountable odds to meet aggressive new effluent nutrient limits, the Murfreesboro Water Resources Department team members banded together.
They...
Editorial
Case Studies - August 2020
Washing system helps eliminate FOG problem
Problem: A large north Florida regional wastewater system was battling FOG up to 4 feet thick that was...
Editorial
Case Studies - February 2020
Decanter centrifuge reduces biosolids disposal costs
Problem
Hollandia Dairy in Southern California was paying to transport 25,000 pounds of wastewater biosolids a day.
...
Editorial
Operators Collaborate With a Professional Designer on a Treatment Plant Welcome Sign
The team at the Weirton (West Virginia) Wastewater Treatment Plant wanted to make a great impression on visitors pulling up to the...


















