During the summer of 2015 the Waging WWTP in the Bavarian Chiemgau district was desperately looking for an energy-efficient, high-performance sludge thickening plant to replace the centrifuge they had been using. The objective was to optimize digester capacity, gas yield and sludge handling in the overall process on site.
Download the case study to read more.
Download Case Study