Simple package improves dewatering
Problem
An upgrade to the Groton (N.Y.) Wastewater Treatment Plant from 0.35 to 0.5 mgd included sequencing batch reactors followed...
Entries Tagged Headworks International, Inc.
Editorial
A Smooth Transition
When the 3.85 mgd Coatesville (Pa.) Regional Wastewater Treatment Plant needed to increase capacity and meet more stringent permit limits, owner Pennsylvania...
Editorial
Conveyor/Compactor Keeps Screenings from Clogging Plant
The ScrewpactorHD heavy-duty shafted spiral conveyor/compactor from Headworks can bust, crush and tear up materials such as fired clay brick, blocks of...
Editorial
Case Studies: Headworks/Biosolids
Improved capacity and space savings
Problem
The 3.15 mgd (design) treatment plant in Marseilles, Ill., averaged 1.25 mgd and produced 55 dry tons of...
Editorial
Case Studies
Bar screen lowers maintenance costs
Problem
The Camrosa Water Reclamation Facility in Camarillo, Calif., recycles 1.5 mgd for irrigation, but the mechanical bar screen...
Editorial
On the Band-Wagon
Neutrally buoyant produce labels and other floating bits of plastic were passing through the Dublin San Ramon (Calif.) Services District Recycled Water...
Editorial
Less Is More
At the RAE Water & Sewer District near Bozeman, Mont., just two operators do all the work at a 70,000 gpd activated...