Main-to-House (MTH) lateral lining from Carylon Corporation is an effective solution for problem laterals. From within the mainline sewer, a specialized lateral packed unit, used in conjunction with a CCTV camera, is moved into position at the lateral connection. An epoxy-impregnated CIPP liner is then inverted into the lateral and is inflated using high-pressure air inversion. The curing process, using steam, takes approximately two hours to complete. Once cured, the liner provides a new jointless, tight-fitting, and infiltration-free lateral pipe. The lining process can rehabilitate up to 80 feet of lateral pipe without the need of a clean-out. 800/621-4342; www.caryloncorp.com; Booth #1170
 



Discussion

Comments on this site are submitted by users and are not endorsed by nor do they reflect the views or opinions of COLE Publishing, Inc. Comments are moderated before being posted.